|
5. CABLE PREPARATION-SINGLE SHEATH, WITH PLASTIC INSULATION 5.1 Mark the outer sheath for a 6" opening, at least
20 inches from any closure or cable termination. Scuff and clean a 4 inch area
completely around the sheath at each end of the marked section. | ||
![]() | ![]() | |
5.3 Push the base of the Bond Clamp (round end first)
between the core wrapper and the shield so that the stud is flush with the edge of the outer side of the opening.
| ||
![]() | ![]() | |
PAGE 4 - GO TO PAGE 1 | 2 | 3 |
5 | 6 | 7 |
8 | 9 | 10 |
HOME |